Warehouse Manchester
J&J were tasked with a roof and rack installation for a regional distribution centre consisting of 10mm/min roof and rack protection alongside 23mm/min roof only protection. The system is fed from a new twin diesel and two cylindrical tanks also designed and installed by J&J.