Hilton, London Bankside
A new-build, five-star Hilton Hotel located immediately behind the Tate Modern, was finished to the highest standards to capture the high-end market of both business and vacation stay.
Brief
J&J to to install, test and commission a BS 12845 LPCB compliant twin electric sprinkler water supply, complete with 135cu.m GRP tank to feed wet sprinkler systems to OH III standard on the ground floor and basement areas. Ordinary hazard 1 category standard required on floors 1 to 7. J&J to supply bespoke colours, types and finishes of sprinklers to comply with architect and designer requirements for each room. Three BS 9990-compliant dry riser systems required to three corners of the building.
What we did
- BS12845 sprinkler system
- BS9251 sprinkler system
- Wet Risers inc. pumps and tanks
- Dry Risers
- Pump House